5. Tye channel. Red circles show timber hitches. Blue shows water culvert.

6. This explains the direction of water run off.

7. This shows the reconstruction of dam at top of tye channel. This was constructed using the evidence left behind.

8. Showing timber reconstruction as it may have appeared.